Agent Skills: Changeover Optimizer

Setup and changeover time reduction skill with SMED methodology and sequence optimization

workflow-automationID: a5c-ai/babysitter/changeover-optimizer

Install this agent skill to your local

pnpm dlx add-skill https://github.com/a5c-ai/babysitter/tree/HEAD/plugins/babysitter/skills/babysit/process/specializations/domains/business/operations/skills/changeover-optimizer

Skill Files

Browse the full folder contents for changeover-optimizer.

Download Skill

Loading file tree…

plugins/babysitter/skills/babysit/process/specializations/domains/business/operations/skills/changeover-optimizer/SKILL.md

Skill Metadata

Name
changeover-optimizer
Description
Setup and changeover time reduction skill with SMED methodology and sequence optimization

Changeover Optimizer

Overview

The Changeover Optimizer skill provides comprehensive capabilities for reducing setup and changeover times. It supports SMED (Single-Minute Exchange of Die) methodology, sequence optimization, and changeover time tracking.

Capabilities

  • Internal/external setup separation
  • Changeover video analysis
  • Parallel task identification
  • Standardization opportunities
  • Quick-release mechanisms
  • Sequence optimization
  • Changeover matrix
  • Time reduction tracking

Used By Processes

  • LEAN-004: Kanban System Design
  • CAP-002: Production Scheduling Optimization
  • LEAN-003: Kaizen Event Facilitation

Tools and Libraries

  • Video analysis tools
  • SMED templates
  • Time study software
  • Scheduling optimization

Usage

skill: changeover-optimizer
inputs:
  equipment: "Injection Molding Press 5"
  current_changeover_time: 120  # minutes
  target_changeover_time: 30
  changeover_data:
    video_analysis: "changeover_video_url"
    task_breakdown:
      - task: "Remove old mold"
        time: 15
        type: "internal"
      - task: "Get new mold from storage"
        time: 20
        type: "internal"
      - task: "Install new mold"
        time: 25
        type: "internal"
      - task: "Connect utilities"
        time: 15
        type: "internal"
      - task: "Adjust parameters"
        time: 25
        type: "internal"
      - task: "Run test shots"
        time: 20
        type: "internal"
outputs:
  - current_state_analysis
  - internal_external_separation
  - improvement_opportunities
  - optimized_procedure
  - changeover_matrix
  - implementation_plan

SMED Methodology

Stage 1: Separate Internal and External Setup

| Type | Definition | Goal | |------|------------|------| | Internal | Must stop machine | Minimize | | External | Machine running | Maximize |

Stage 2: Convert Internal to External

  • Pre-stage tools and materials
  • Pre-heat/pre-cool components
  • Prepare documentation
  • Pre-adjust settings

Stage 3: Streamline All Operations

  • Parallel tasks (multiple operators)
  • Eliminate adjustments
  • Standardize procedures
  • Use quick-release mechanisms

Changeover Analysis

Current State:
- Total time: 120 minutes
- Internal: 100 minutes
- External: 20 minutes

Improvement Opportunities:
1. Move mold retrieval to external: -20 min
2. Pre-heat mold: -10 min
3. Use quick-clamps: -15 min
4. Parallel connection work: -10 min
5. Eliminate test shots: -15 min

Target State:
- Total time: 30 minutes
- Internal: 25 minutes
- External: 35 minutes

Changeover Matrix

| From / To | Product A | Product B | Product C | |-----------|-----------|-----------|-----------| | Product A | - | 30 min | 45 min | | Product B | 35 min | - | 25 min | | Product C | 40 min | 30 min | - |

Quick Changeover Techniques

| Technique | Application | |-----------|-------------| | Quick-release clamps | Replace bolts | | Intermediate jigs | Pre-positioned tooling | | Color coding | Visual identification | | One-turn fasteners | Reduce turns required | | Standardized heights | Eliminate adjustments | | Preset gauges | Eliminate measurement |

Implementation Steps

  1. Document current state (video)
  2. Separate internal/external
  3. Convert internal to external
  4. Streamline internal setup
  5. Streamline external setup
  6. Standardize and train
  7. Track and improve

Integration Points

  • Production scheduling systems
  • Video analysis tools
  • Training platforms
  • OEE tracking systems