Agent Skills: Process Economics Estimator Skill

Process economics estimation skill for capital costs, operating costs, and profitability analysis

Process DesignID: a5c-ai/babysitter/process-economics-estimator

Install this agent skill to your local

pnpm dlx add-skill https://github.com/a5c-ai/babysitter/tree/HEAD/plugins/babysitter/skills/babysit/process/specializations/domains/science/chemical-engineering/skills/process-economics-estimator

Skill Files

Browse the full folder contents for process-economics-estimator.

Download Skill

Loading file tree…

plugins/babysitter/skills/babysit/process/specializations/domains/science/chemical-engineering/skills/process-economics-estimator/SKILL.md

Skill Metadata

Name
process-economics-estimator
Description
Process economics estimation skill for capital costs, operating costs, and profitability analysis

Process Economics Estimator Skill

Purpose

The Process Economics Estimator Skill performs economic analysis of chemical processes including capital cost estimation, operating cost calculation, and profitability metrics.

Capabilities

  • Capital cost estimation (factored, equipment-based)
  • Operating cost calculation
  • Raw material cost analysis
  • Utility cost calculation
  • Labor cost estimation
  • Depreciation and taxes
  • Profitability metrics (NPV, IRR, payback)
  • Sensitivity analysis
  • Monte Carlo simulation

Usage Guidelines

When to Use

  • Evaluating project economics
  • Comparing process alternatives
  • Supporting investment decisions
  • Analyzing sensitivity

Prerequisites

  • Equipment list available
  • Capacity defined
  • Utility requirements known
  • Market prices available

Best Practices

  • Use appropriate estimation method
  • Document all assumptions
  • Include contingency
  • Perform sensitivity analysis

Process Integration

This skill integrates with:

  • Equipment Sizing and Specification
  • Process Flow Diagram Development
  • Separation Sequence Synthesis

Configuration

process-economics-estimator:
  estimation-classes:
    - order-of-magnitude
    - study
    - preliminary
    - definitive
  profitability-metrics:
    - NPV
    - IRR
    - payback
    - ROI

Output Artifacts

  • Capital cost estimates
  • Operating cost analyses
  • Cash flow projections
  • Profitability analyses
  • Sensitivity charts