Issue Decomposition Skill
Transform high-level project descriptions into well-structured GitHub issues. Each issue includes a user story, acceptance criteria, dependencies, labels, and a story-point estimate on the powers-of-two scale from the estimating-work-items skill.
When to Use
Activate this skill when:
- User describes a feature or project to break down
- User says "create issues for...", "break this into tasks", "decompose this feature"
- During project planning to generate actionable work items
- When converting requirements into GitHub issues
When NOT to use: not for single bug reports or tasks already small enough to be one issue; not for dependency visualization (use the dependency-mapping skill).
Issue Template
Each generated issue follows this structure:
# [Concise, Action-Oriented Title]
## User Story
As a [persona/role], I want [goal/action] so that [benefit/value].
## Description
[2-4 sentences explaining the context and what needs to be done]
## Acceptance Criteria
- [ ] Criterion 1: Specific, testable requirement
- [ ] Criterion 2: Another measurable outcome
- [ ] Criterion 3: Edge case or validation requirement
## Dependencies
- Blocked by: #[number] - [brief reason]
- Blocks: #[number] - [what depends on this]
## Labels
`[type]`, `[area]`, `[priority]`, `points-[n]`
## Estimate
**[n] points**
Compared with: [smaller reference] ([n]) and [larger reference] ([n]) - [why it is closer to one than the other].
Main unknown: [the one thing most likely to make this bigger], or "none".
Estimated by: [model] in [harness], estimating-work-items [version]
Decomposition Process
Step 1: Understand the Scope
Ask clarifying questions if needed:
- What is the core goal of this project/feature?
- Who are the primary users?
- Are there any technical constraints or preferences?
- What's the target timeline?
Step 2: Identify Major Components
Break the project into 3-7 major areas:
- Foundation/Setup tasks
- Core functionality
- Supporting features
- Integration points
- Testing/Validation
Step 3: Generate Issues
For each component, create issues that are:
- Independent: Minimal dependencies on other issues
- Negotiable: Clear what, flexible how
- Valuable: Delivers user or technical value
- Estimable: Passes the estimability gate in
estimating-work-items(you can say what done looks like) - Small: 8 points or less on the powers-of-two scale; anything bigger is an epic with its own children
- Testable: Has clear acceptance criteria
Step 4: Map Dependencies
Identify blocking relationships:
- Sequential dependencies (A must finish before B)
- Parallel opportunities (can be done simultaneously)
- Critical path (longest chain of dependent issues)
Step 5: Preview Before Creating
Always show the user a summary before creating issues:
## Proposed Issues (N total)
| # | Title | Points | Dependencies |
|---|-------|--------|--------------|
| 1 | Setup project structure | 2 | None |
| 2 | Implement core feature X | 4 | Blocked by #1 |
...
Proceed with creation? (y/n)
Step 6: Create the Issues
On approval, create each issue with gh issue create --title ... --body ... --label ... (requires the gh CLI authenticated for the repo). If gh is unavailable, output the issue bodies for manual creation.
Label Taxonomy
Check existing repo labels first (gh label list) and prefer them over this default taxonomy.
- Type:
feature,enhancement,bug,chore,docs,test - Area:
frontend,backend,database,infrastructure,security - Priority:
priority:high,priority:medium,priority:low - Estimate:
points-1,points-2,points-4,points-8(issues);epicwith nopoints-*label (epics, whose points are the sum of their children)
Estimation Guidelines
Size every issue with the estimating-work-items skill: score effort, complexity, and uncertainty, triangulate against reference stories, and pick one bucket on the powers-of-two scale.
| Points | Kind | Rule |
|--------|------|------|
| 1, 2, 4, 8 | issue | 8 is the ceiling for a single issue |
| Sum of children, no limit | epic | Anything bigger than 8. Never created as a plain issue. Label it epic and decompose it into children of 8 or less; a child bigger than 8 is decomposed again |
An epic is not estimated directly. After decomposing it, add up the children: the exact sum, unrounded and uncapped, is the epic's points. Points are relative size, not days; timeline-planning owns the conversion to durations.
Best Practices
- Start with the foundation - Setup and infrastructure issues first
- One concern per issue - Each issue does one thing well
- Clear acceptance criteria - Know when it's done
- Explicit dependencies - Note what blocks what
- Honest estimates - Name the main unknown in the Estimate section instead of padding the number
- Consistent labels - Use established taxonomy
- Link related issues - Cross-reference for context
Example Decomposition
See example.md for a worked decomposition of "Build a user authentication system" (an epic) into 7 issues totalling 18 points.
After Decomposition
Once issues are created:
- Suggest running
dependency-mappingskill to visualize relationships - Suggest running
timeline-planningskill to create a Gantt chart - Offer to save the decomposition summary for future reference