Critical Path
- Mistakes here lose Users and revenue directly.
- One Process: measure blast radius, get Architect approval for dangerous actions, then verify the dependent Capability still holds.
1. Measure the blast radius
Use /trace to measure callers and complexity for what you are changing. Read the nearest Claude.md for the boundary it protects.
Treat high caller count and repo-p95 complexity as Critical Path
A file with at least 20 callers or repo-p95 complexity requires this Skill before editing.
2. Confirm with the Architect before dangerous actions
Approval in one Context never extends to another.
IF the action is destructive, hard to reverse, visible outside the repo, or a third-party upload:
Wait for Architect approval before acting
Destructive means delete, drop, kill, or overwrite. Hard to reverse means force-push, git reset --hard, package removal, or continuous integration change. Visible outside the repo means push, pull request, or shared-infrastructure change.
Never bypass safety checks
Do not use --no-verify or --no-gpg-sign to get past a guard.
Root-cause obstacles instead of clearing them destructively
Do not solve an obstacle with a destructive operation.
IF state is unexpected:
Treat it as another Agent's in-progress work until traced
Unexpected state includes unfamiliar files, branches, and locks.
3. Verify the Capability held
Exercise what depends on the change and show the observed output.
Verification is observed behavior
The Skill is not complete until the dependent Capability ran and the output is captured.