Deploy Release Skill
[!IMPORTANT] Prepare and verify a staged or production deployment with rollback and smoke checks.
Optional args: slug=<feature>, ticket=<id/url>, mode=interactive|autonomous|channel, channel=<id>, auto_continue=true|false, profile=business|hybrid|technical.
Instructions
When the user asks to perform this workflow, execute the following steps:
Deploy Release Workflow
Goal: Ship verified work with explicit deployment steps, smoke checks, and rollback criteria.
Steps
- Confirm readiness (STLC Stage 6 Closure):
- Verify test cycle closure summary, open defect ledger, and residual-risk ledger per
skills/quality-engineering/quality-engineering-test-plan-authoring/references/lifecycle-and-roles.md. Technical PASS confirms verification only; named release owner authorization is required. - Mobile release gates (Contract C6): verify build artifact digest/version, release signing/distribution context, and device smoke checks. Missing build artifacts or drivers cannot be replaced by web evidence.
- Migrations, feature flags, and product evidence contracts accounted for (
evidence.jsonmeasurement owner, MET baseline, instrumentation, guardrails). release_confidenceishigh, ormediumwith documented risk;lowis NO-GO without written release owner override.- Identify version, environment, deploy command, and owner.
- Confirm secrets, config, queues, cron, and external services.
- Define rollback command or revert path.
- Environment tier: dev deploys freely; staging deploys behind the smoke gate; production is prepared by the agent and authorized by the named release owner through the guardrail approval gate.
- Verify test cycle closure summary, open defect ledger, and residual-risk ledger per
- Deploy:
- Run staging deploy first when available.
- Rehearse the rollback in staging before promoting to production.
- Run smoke checks before promotion.
- Promote only when smoke checks pass.
- Monitor:
- Check logs, metrics, errors, latency, and core user flows.
- Guardrail harm or regression escalates immediately to authorized incident controls (
incident-hotfix); stop or roll back on defined failure signals.
- Persist and route:
- Write run record to
artifacts/runs/[slug]/[compactISO]-deploy-release.jsonwhen file writes allowed. Featurefeature_status=releasedis preserved even when product value observations remain pending or inconclusive. - User-facing notes ->
publish-notes. - Process and standards feedback ->
retro-learn.
- Write run record to
Runtime Contract
- Use once verification/UAT signoff is PASS and a release window is open.
- Required inputs: verification report plus release version, environment, and rollback path. Proposal in ledger is not host deployment authorization.
- Return BLOCKED when required approvals, migrations, or rollback path are unresolved, when a production deploy has no named authorizer, or when a product-evidence initiative lacks a registered MET baseline (or scoped exception), measurement owner, instrumentation, guardrails, or review trigger. Feature released status is retained when product value is pending or inconclusive.
Handoff Payload
slug,release_confidence, release verdict (GO/NO-GO/ROLLED-BACK), smoke check results, measurement contract refs when present, rollback path, outcome report, next workflow.
Blocking Questions
- Ask max 3 at a time with a recommended default and 2-3 options.
Output Template
# Deployment Report: [Name]
## Release Verdict
GO | NO-GO | ROLLED-BACK
## Release
## Environments
## Commands
## Smoke Checks
| Check | Result | Evidence |
| --- | --- | --- |
| [check] | [PASS/FAIL/BLOCKED] | [evidence] |
## Rollback
## Outcome Report
{schema_version: 1, run_id: "[run-id]", slug: "[slug]", workflow: deploy-release, feature_status: released, started_at: "[timestamp]", completed_at: "[timestamp]", requirement_trace: {brd_objectives: [], requirements: [], acceptance_criteria: [], srs: []}, completed_evidence: [], missing_evidence: [], decision_needed: [], recommended_next_workflow: publish-notes, cost: {source: unavailable}, agent: {identity: "[agent-identity]", model: "[model]"}}
## Next Workflow
publish-notes | retro-learn
## Cost Report
Call `get_session_cost(workflow="deploy-release")` before final handoff.