Purpose

Backpressure lets downstream checks reject incomplete work before a human has to catch it. The manager coordinates the run, workers produce plans and patches, verifiers run mechanical checks, and independent reviewers assess correctness and risk.

The protocol should be no more complicated than the guarantees it protects. Externalize the state needed for each action, then start it in a fresh child so stale assumptions and prior role context do not silently shape the result. Truth comes from the active contract, current repository state, and attributable evidence, not session continuity.

Core Invariants

Apply these rules to every run:

  1. The manager owns one authoritative decision record. The latest explicit user feedback overrides earlier plans, agent-authored specifications, and reviewer assumptions. A superseded decision is never an active requirement.
  2. Define the goal, scope, acceptance criteria, required checks, and stop point before depending on them. Do not guess unresolved requirements or authority.
  3. Preserve the final agreed plan's terminology, sequence, boundaries, ownership, public API shape, conditions, and non-goals. Normalize structure, not meaning, and do not copy the full discussion transcript.
  4. Keep producer, verifier, and reviewer responsibilities separate. A worker cannot approve its own patch, and worker-run commands are diagnostic only.
  5. Verifiers and reviewers do not edit the validation subject.
  6. Bind every gate decision to the active validation specification and current repository state. Evidence for another state is STALE, not PASS.
  7. Start every new delegated action in a fresh child. Resume only the exact same unfinished action under the narrow continuity exception below.
  8. Bound total child calls and repair rounds across fresh launches and resumes.
  9. Do not repeat an unchanged failure without new evidence.
  10. Run final required mechanical checks and an independent whole-changeset review against one frozen candidate. Mechanical success does not establish semantic correctness.
  11. Link every active correctness decision and acceptance criterion to current evidence or an explicit blocker.
  12. Stop for unresolved requirements, exhausted budget, repeated failures, or unavailable required evidence instead of weakening a gate.
  13. Treat stop_after and authorization for every Boundary Action as separate decisions. Authorization permits an exact action; it does not require one or authorize adjacent operations.
  14. Keep Boundary Actions declarative and ordered; they must not become arbitrary hooks or mutate the frozen candidate without reopening the correctness loop.

Gate outcomes are PASS, SEND_BACK, BLOCKED, STALE, and ESCALATE_HUMAN. Only PASS advances.

Roles

Intake Coordinator

Read references/run-lifecycle.md before activating or reusing a contract. Choose new (default), extend (justified expansion), or continue (unfinished contract). For new, dispatch a fresh manager without inherited conversation history. The coordinator handles intake and user communication, not gates. An assigned manager starts directly without another manager dispatch. Report unavailable isolation.

Manager

The run's manager owns the decision record, faithful projection of the agreed plan, contract activation, routing, budget accounting, gate decisions, evidence synthesis, Boundary Action coordination, and human handoff. It delegates each action to the named specialized workflow or tool and records child IDs, fresh or resumed mode, and any resume reason. Child IDs are operational state, not fields a child must discover or report about itself.

When explicit user feedback creates, resolves, or changes a correctness decision, the manager records the active decision, marks any prior decision superseded, updates every linked normative contract field and affected plan step, and recomputes the validation specification hash before work continues. Children report conflicts; they do not maintain or rewrite the decision record.

The manager must not:

  • Write implementation patches.
  • Run authoritative mechanical checks.
  • Perform the only correctness review.
  • Reset an unchanged run's budgets by changing sessions, run IDs, or gate names.
  • Mint a new run or extension grant to bypass failure or authority stops.
  • Infer permission for an external action.

Worker

A worker creates a plan or the next coherent patch. It preserves unrelated worktree changes and does not approve its own output. A plan revision, patch repair, investigation, or distinct work slice is a new action and uses a fresh worker with an explicit handoff.

Verifier

A verifier runs the contract's mechanical checks without editing source files. A changed state, check set, gate, or verification purpose creates a new action and uses a fresh verifier. Retain cumulative budgets and completed evidence that still matches the current state; evidence reuse does not require session reuse.

Reviewer

A reviewer is independent of the worker, does not edit files, and uses a fresh child. The child loads plan-reviewer or code-reviewer for the manager's exact request; the manager owns mapping and routing through references/gate-checklist.md.

Invocation Freshness

An action identity consists of the run_id, role, gate, requested action, applicable specification hashes, current state_id, and declared check or review scope. Launch a new child or subtask with no inherited child transcript for every new action. A new child ID created by forking an earlier child transcript is not fresh. Boundary Action identity also includes every manifest field, including exact authorization and payload.

Resume a child only when the original action has not returned a terminal result, every action-identity field is unchanged, and one of these conditions applies:

  • A transport or protocol interruption stopped the action.
  • A specialized workflow explicitly requires non-reconstructible child-local runtime state.
  • The user explicitly requires continuity without weakening role separation or a gate.

Before resuming, re-establish the current contract and repository state and record the concrete reason. A partial result from an unfinished check set may remain valid when it matches the same state; run only the incomplete portion. Familiarity, useful context, token savings, ownership of a prior patch or finding, or membership in the same gate are not sufficient reasons to resume.

Do not resume when an action returned a terminal result; any action-identity field changed; a decision, plan, candidate, work slice, role, or gate changed; a repair or changed-state recheck begins; or an independent or final judgment is required. Do not switch a child between worker, verifier, reviewer, or specialist roles.

Active Contract And State

Create or update BACKPRESSURE.md before launching work. Keep it limited to one active run. Apply references/run-lifecycle.md and the template in references/backpressure-contract.md before reusing a contract or its budgets.

The active run records:

  • run_id, request mode and source, profile, and manager context isolation
  • Concise decision sources, normative active decision bindings, superseded decisions, and unresolved decisions
  • Goal, scope, out-of-scope boundary, and acceptance criteria
  • Required ownership boundaries, public API shape, and a semantically faithful agreed plan
  • Required correctness checks and review triggers
  • validation_spec_hash and publication_spec_hash when publication is required
  • Repository base, HEAD, and current state_id
  • The ordered Boundary Action manifest, stop_after, and separate exact action authorization
  • Child-call and per-gate repair limits and usage, plan-review allowance, final-call floor, and compact idempotent extension grants
  • Current blockers, gate results, and acceptance status
  • Per-action status, result, evidence binding, and authoritative read-back
  • Tool-reported child identity, invocation mode, and any resume reason attached to the applicable evidence

validation_spec_hash covers correctness-affecting contract fields, including active decision bindings, the agreed plan, ownership and public API constraints, goal, scope, acceptance criteria, base, required correctness checks, and review requirements. Action authorization and mutable control state are outside that hash.

Changing a correctness-affecting decision requires an atomic decision-record and specification update. Evidence whose declared decision, criterion, check, or review coverage changed becomes stale; final semantic review always becomes stale. The manager may carry unaffected evidence forward only with an explicit dependency-based reason. Concise source excerpts, superseded history, and unresolved-decision context remain outside the hash so wording-only history edits do not invalidate evidence. A source edit that changes meaning or authority is a new decision, not metadata cleanup. Changing only authorization or stop_after does not invalidate correctness evidence; verify those values again immediately before an action.

publication_spec_hash separately covers required publication artifacts, checks, and judgment review. Changing it makes publication-readiness evidence stale without invalidating unaffected correctness evidence.

state_id identifies the validation base plus candidate content, including all relevant staged, unstaged, and untracked content while excluding BACKPRESSURE.md and .backpressure/**. Record HEAD separately; commit-object identity is not part of this content identity. Use one deterministic implementation for the run. Evidence records the opaque state_id; detailed identity components are recorded once in the active run.

Archive replaced contracts at .backpressure/runs/<run_id>/run.md. New runs retain only relevant handoff facts, not historical approvals or evidence. Never record secrets.

Profiles And Budgets

Choose the lowest profile that covers known risk. Use Standard when uncertain.

| Profile | Use when | Max child calls | Repair rounds per gate | Final-call floor | |---|---|---:|---:|---:| | Lite | Localized, low-risk work | 10 | 2 | 3 | | Standard | Ordinary multi-file or behavioral work | 20 | 3 | 4 | | Critical | Auth, security, migration, data loss, concurrency, production, or release risk | 32 | 4 | 6 |

These are initial ceilings, not targets. Apply references/run-lifecycle.md before dispatch: new starts with full profile limits; extend adds a unique profile-sized or explicit grant; continue preserves limits and usage. Every child launch or resume costs a call; completed non-pass gates cost repair rounds. Plan review allows two calls per initial or material-extension allowance. Boundary Actions retain two attempts. Recompute the final-call floor; never add floors.

Handoffs

Do not copy the full contract or run history into child prompts. Send:

Run ID: <run_id>
Role: <role>
Contract reference: BACKPRESSURE.md#validation-spec:<hash>
Decision source reference: BACKPRESSURE.md#decision-sources
Publication reference: BACKPRESSURE.md#publication-spec:<hash> | not applicable
Repository root: <path>
Base: <sha | immutable reference>
Current state ID: <state_id>
Decision IDs: <relevant active and superseded IDs | none>
Gate: <gate>
Requested action: <one action>
Delta: <changed files, findings, or contract fields | none>

Before dispatch, the manager adds and checks the required role-specific fields in references/subagent-prompts.md, then derives the action identity from the full handoff. It launches fresh and records mode and any valid resume reason outside the specification. Recover missing facts from sources; never invent them.

The child reads the references and acts in the same invocation without an identity handshake. If context or state cannot be established, non-reviewers return STALE or BLOCKED; reviewers return capability SUBJECT_MISMATCH or INCOMPLETE for manager mapping. Neither may substitute prior evidence for the referenced state.

If required facts remain unavailable, report the gap and route investigation or handoff.

Default Flow

1. Contract

  1. Apply references/run-lifecycle.md; preserve work and choose the review base.
  2. Discover the goal, decision sources, active and superseded decisions, scope, checks, risk, repository state, stop point, and authorization without guessing.
  3. Project the final agreed plan faithfully; an already user-approved plan needs no duplicate worker approval. Preserve accepted terminology, ordering, constraints, ownership, public API shape, and non-goals.
  4. When a structural request such as split, move, extract, merge, unify, or separate has plausible interpretations that materially change the diff, ownership boundary, or public API, ask one focused axis question before freezing the contract. Do not force clarification when those outcomes are materially the same.
  5. Select the profile and initialize, extend, or retain budgets for the mode.
  6. Activate BACKPRESSURE.md and compute specification hashes and state ID.
  7. Stop before planning or implementation when a required decision or material structural axis remains unresolved.

2. Plan When Needed

Use a planning worker and one independent plan-review action for Standard and Critical work, or when architecture, migration, rollback, or scope is uncertain. Lite may proceed without a separate plan review unless the user requested a plan stop or the task has a load-bearing decision.

Before each review, hash the exact plan into the validation specification and launch a fresh plan-reviewer child through references/subagent-prompts.md. Required coverage includes semantic drift, scope, ownership, public API, repository fit, load-bearing decisions, and superseded decisions. Map the report through references/gate-checklist.md; a plan edit invalidates dependent evidence.

If backpressure creates a materially new plan, stop before patching until the user agrees. Findings cannot broaden scope; plan changes need renewed agreement, and unrelated findings are reported rather than fixed.

After a revision, use a fresh reviewer for the second and final review in that plan allowance. Unresolved blockers or SHOULD findings then require escalation. Only a user-authorized material contract extension grants another plan allowance under references/run-lifecycle.md; ordinary revisions and reviewer replacement never reset it or remove existing findings.

3. Before Work Actions

After Contract and any required Plan Gate pass, execute eligible before_work actions in manifest order without crossing stop_after. A required non-pass blocks implementation; an optional non-pass may continue only when independent of every correctness prerequisite. An action-ID stop executes through that action.

Bind plan-publishing evidence to agreed-plan@<validation_spec_hash>. Publishing a plan does not make the external copy a Decision Source unless the user grants it that authority.

4. Work And Verify

For each coherent patch:

  1. Let a fresh worker implement only the requested slice and record its new state_id.
  2. Ask a fresh verifier to run applicable targeted checks once for that state.
  3. Reject evidence whose state differs or whose check changed the candidate.
  4. Apply the conditional root-cause evidence rule before a triggered production repair or scope expansion.
  5. After targeted PASS, use a fresh code-reviewer child with the simplicity lens only for a trigger in references/simplicity-review.md.
  6. Route a supported repair to a fresh worker.
  7. Reverify and rereview every repair against its new state_id before freezing.
  8. Run any other fresh focused risk or blocker review through code-reviewer only when required.
  9. Stop when the gate passes, blocks, or reaches budget.

Mechanical failure normally prevents review for that attempt. Use review for diagnosis only when mechanical evidence cannot identify a route.

Require stronger root-cause evidence only when a proposed next step would widen production scope based on one failing test, change a transaction boundary, change locking or concurrency behavior, or act before fixture-versus-production attribution is resolved. Before that production change, establish where applicable and feasible:

  1. The authoritative precondition.
  2. A clean fixture reproduction.
  3. A control case that isolates the suspected path.
  4. Transaction ownership and exception propagation when transaction behavior is implicated.
  5. The concrete lock target and acquisition order when locking or concurrency is implicated.

Record an unverified cause as a hypothesis, not a conclusion. Missing evidence cannot produce PASS or an immediate production repair. Route a focused investigation to an available worker, verifier, reviewer, or specialist owner; use BLOCKED when evidence is unavailable and ESCALATE_HUMAN when a requirement or authority decision is needed.

5. Final Correctness

Stop repository-changing work and freeze the active decisions, agreed plan, current validation_spec_hash, base, and state_id.

  1. A fresh verifier runs all required final mechanical checks.
  2. A fresh independent child loads code-reviewer for the whole changeset and required semantic context. The manager maps its capability report; the reviewer does not approve the gate.
  3. The manager confirms every active correctness decision and acceptance criterion has current evidence.
  4. Mechanical PASS proves only that declared commands passed on the referenced state; it cannot substitute for semantic review.
  5. Any candidate-content or correctness-specification change returns the gate to pending.

Targeted checks and focused reviews do not replace this final gate.

6. Publication Readiness When Needed

Create a publication-readiness checklist only when an after_final action needs it. Map each item to the action it must precede. Include required lockfiles, generated artifacts, changelog, version metadata, migration packaging, and project-specific publication checks. A verifier owns mechanical publication checks. Use an independent reviewer only when the publication specification requires judgment review.

Correctness may pass while publication readiness is blocked. Candidate-changing repairs reopen it. After commit, preserve content-bound evidence only when the committed tree equals the frozen candidate; rerun commit-dependent checks against the exact HEAD.

7. After Final Actions And Handoff

Final Correctness must pass before any after_final action. Execute eligible actions sequentially from the manifest:

  1. Confirm the action is not beyond stop_after.
  2. Confirm current target-specific authorization and operation mode.
  3. Confirm its prerequisites and applicable publication readiness pass.
  4. Delegate to the declared specialized skill or tool.
  5. Read the resulting state back from the authoritative source.

Candidate mutation takes precedence over action failure classification. Classify each changed path: lockfiles, changelogs, and generated release artifacts are publication repair; every other candidate change is a work slice. Mixed changes follow both routes and cannot hide non-publication work. Recompute state_id and reopen Final Correctness regardless of requiredness. When content is unchanged, a required failure blocks later actions without changing correctness PASS; an optional failure may continue only to independent actions. On timeout or partial success, read back before retrying. Recheck current prerequisites, stop point, budget, and authorization, then retry only confirmed-incomplete idempotent work. Without authoritative read-back, preserve reported success as tool-reported-only and do not repeat it. A commit retains content-bound evidence only when its tree equals the frozen candidate.

Commit permission does not imply push or PR permission. Push permission does not permit force-push or creating a commit. PR permission does not permit commit or push. PR update authorization must list the exact mutation; updating a body does not authorize changing the base, labels, state, or merge status. Deployment, release, production mutation, and notifications require a separate explicitly authorized workflow.

Failure Routing

Choose a route first, then record the responsible owner and optional detail tags.

| Outcome | Use when | Default route | |---|---|---| | SEND_BACK | Worker-, fixture-, or tooling-owned repair is supported by evidence | Send a focused delta to a fresh child in the owner role | | BLOCKED | Baseline, environment, or unavailable-evidence condition prevents progress | Wait, isolate once, or hand off | | STALE | An applicable specification hash or candidate state differs | Discard affected evidence and reverify current state | | ESCALATE_HUMAN | A requirement, authority, risk decision, or budget is unresolved | Ask for one focused decision |

Useful owner values are worker, environment, tooling, and human. Optional tags such as fixture, baseline, session_lost, or authorization preserve diagnostic detail without expanding the routing state machine.

To diagnose a baseline failure, use an isolated read-only base workspace or immutable snapshot. Never reset, checkout over, or overwrite the active worktree. Keep a required baseline failure BLOCKED; do not waive it. When it prevents an acceptance criterion and no authorized repair or waiver route can establish that criterion, escalate the handoff for one focused human decision without reclassifying the failed check as PASS.

When the conditional root-cause rule applies, SEND_BACK routes a focused investigation only when an owner and investigable question exist. Do not route a speculative production repair. Use ESCALATE_HUMAN for unresolved intended behavior, ownership, or authority, and preserve environment or unavailable evidence as BLOCKED.

Evidence Standard

Mechanical evidence needs:

  • Gate and current state_id
  • Actual command and cwd
  • Exit status and result
  • Relevant output excerpt or reference
  • Failure owner and route when non-pass
  • Exact before and after HEAD for a commit-dependent check

Review evidence needs:

  • Gate, review scope, and current state_id
  • Findings with stable IDs, severity, and file, line, or symbol evidence
  • Active decision IDs and concise source references covered
  • Forbidden and out-of-scope changes, ownership boundaries, public API shape, and superseded-decision reintroduction checks
  • Acceptance-criterion coverage
  • Decision and residual risk

Conditional root-cause evidence also records the trigger, the claimed cause as a verified conclusion or hypothesis, and available precondition, reproduction, control, transaction, exception-propagation, lock-target, and acquisition-order evidence. Record only applicable items and do not invent evidence for unavailable checks.

Publication evidence also records the current publication_spec_hash.

Boundary Action evidence records identity, requiredness, owner, target, operation, payload, prerequisites, authorization, applicable hashes and state, attempts, before/after observations, authoritative read-back, and result. Unknown external outcomes remain non-pass until read-back resolves them.

The manager attaches tool-reported producer identity, invocation mode, and any resume reason to the applicable evidence and updates budgets. Child responses do not maintain duplicate evidence, invocation, or decision ledgers. Add timestamps or environment details only when they matter to a flaky, time-sensitive, or environment-sensitive result.

Stop Conditions

Stop and hand off when:

  • A required contract value or authorization is unresolved.
  • A structural axis that materially changes the diff, ownership, or public API is unresolved.
  • The plan still has a blocker after the second review in its current allowance.
  • A hard budget is reached or another repair would cross the final-call floor.
  • The same failure repeats without new evidence.
  • Required evidence cannot be bound to current state.
  • A required specialized flow has no available owner.
  • The current execution of a required Boundary Action is terminally non-pass or has an unresolved partial result; stale results retain real-world outcome facts.
  • The user asks to stop or stop_after is reached.

The handoff reports the active contract and state IDs, acceptance status, checks, reviews, open blockers, budget usage, action authorization and results, residual risk, and the exact human decision needed.

Reference Files

  • references/run-lifecycle.md defines request modes, manager isolation, and grants; read at intake and before budget decisions.
  • references/philosophy.md explains the underlying model.
  • references/backpressure-contract.md defines the active contract template.
  • references/boundary-actions.md defines the action schema and execution rules.
  • references/subagent-prompts.md defines concise role handoffs.
  • references/gate-checklist.md defines gate decisions without repeating the protocol.
  • references/simplicity-review.md defines the conditional simplicity lens and repair route.